30 September 2026
New-build flooring in Craigieburn, Mickleham and Coolaroo
How northern growth-corridor new builds should approach LVP, wet areas and slab prep before handover.
Flooring guide
Why vinyl needs a flat subfloor, when self-levelling compound is used, and how it affects your quote and timeline. Floor preparation guide from 8K Flooring Group.
Vinyl is thin and flexible, which is part of its appeal. The downside is that it shows what is underneath. Dips, ridges, trowel marks and cracks in a slab can all come through as visible lines, soft spots or gaps between planks. Self-levelling compound is one of the main ways we create a flat surface before vinyl goes down. Here is when it is needed and what it involves.
Self-levelling compound is a cement-based product mixed with water and poured over a prepared floor. It flows out under its own weight and, with a little help from a spreader and spiked roller, settles into a smooth, flat layer. Depending on the product, it can be applied thinly to smooth a surface or built up to fill low spots. Once cured, it gives the vinyl a consistent base.
Manufacturers specify how flat the subfloor must be for their products. Click-lock planks and glue-down vinyls have different tolerances, and sheet vinyl tends to be the least forgiving. We check against the requirements for the product you have chosen.
Self-levelling compound needs a sound, clean surface to bond to. Before it goes down we usually need to remove old adhesives, paint or loose material, often by grinding, then vacuum the surface and apply a primer. Cracks and joints may need treatment first. Thresholds and drains are dammed so the compound stays where it should.
Levelling compound does not fix moisture problems. If a slab is giving off too much moisture, it can affect the compound, the adhesive and the vinyl. We assess moisture before levelling and, where needed, recommend a moisture-mitigation system first. Getting that order wrong is one of the main reasons floors fail early.
Every product has its own drying and curing times, which depend on thickness, temperature and ventilation. Thin applications may be ready relatively soon, while thicker builds take longer. We will tell you what to expect for your job and plan the vinyl install accordingly. Rushing a floor onto damp compound saves a day and risks the whole job.
Levelling is quoted separately from the vinyl because it depends on the condition of your slab, not the product you choose. A quote that shows no preparation on an older home or a slab with tiles removed deserves a question. We list grinding, priming, levelling and moisture treatment as separate items so you can see what each one costs and why it is needed.
Self-levelling compound is mostly used on concrete. Timber subfloors usually need different preparation, such as fixing loose boards, sanding high spots or installing a suitable underlay sheet, depending on the product. We advise on the right method after seeing the floor.
| Floor condition | Likely approach |
|---|---|
| Minor high spots | Grinding |
| Small, local dips | Patching compound |
| Widespread unevenness | Self-levelling compound over the area |
| Old adhesive residue | Grind or scrape back first |
| Timber subfloor | Different approach, often an overlay |
The best way to know whether your floor needs levelling is an on-site check. Request a free quote and 8K Flooring Group will assess your subfloor and give you an itemised price. We are based at 14 West Court, Coolaroo VIC 3048 and work across Melbourne’s north and metro area.
FAQs
Sometimes, with the right compound and conditions. Often drying time is needed. We'll confirm the timeline for your products and site.
It can add a little height, depending on how much correction is needed. We check doors and transitions when we measure.
On our quotes it's listed as a separate preparation line so you can see what the floor needs and why.
30 September 2026
How northern growth-corridor new builds should approach LVP, wet areas and slab prep before handover.
29 September 2026
What drives vinyl flooring quotes in Melbourne — product grade, prep, access and scope — without invented dollar prices.
26 September 2026
A practical subfloor prep checklist — moisture, levelling, uplift — before vinyl or carpet goes down.

Free on-sitemeasure & quote
Free measure & quote
Book a free on-site measure and quote. Homes and commercial sites, from our Coolaroo base.
We measure before we specify — homes and commercial sites.